BEHI/NBS Segment Number (0)
| Extreme |
| Very High |
| High |
| Moderate |
| Low |
| Very Low |
| NO BEHI Score |
Alternative Headwater Credit Protocol (1)
Headcuts/Debris Jam (2)
Base Level Control (3)
Thalweg Buffer Line (4)
| Very High |
| High |
| Moderate |
| Low |
Transect Line (5)
Transect Line (Extended) (6)
Sub-reach Transect Line (7)
Stream CL (8)
Contours 2ft (9)
Roads (10)
Top of Bank (11)
Buildings (12)
|