BEHI NBS Segment Number (0)
| Extreme |
| Very High |
| High |
| Moderate |
| Low |
| Very Low |
| NO BEHI Score |
Alternative Headwater Credit Protocol (1)
Headcuts Debris Jam (2)
Base Level Control (3)
Soiling Sample Location (4)
Transect Line (5)
Sub-reach Transect Line (6)
Top of Bank (7)
Thalweg Buffer Line (8)
| Very High |
| High |
| Moderate |
| Low |
| Very Low |
| NO BEHI Score |
Transect Line (Extended) (9)
NHD Flowline (10)
Buildings (11)
Contours (12)
Roads (13)
Streams (14)
Study Area (15)
|